Linking Data to Graphics
Data is linked to graphics by connecting a table to specific graphics via link templates.
To Connect Data to Graphics/s:
- In a drawing, select one or more graphics.
- In the DataSources tree, double click on the desired table to select it for linking. This will also open the view of the table in the lower frame of the palette.
- In the table view, in the lower frame of the palette, click on the record you wish link.
- Use the Link Template drop-down box located on the palette toolbar to select the desired link template.
- Click the Create Link button on palette toolbar.
- The link between the selected graphics and the table record is created.